The End Row Assembly consists of a two-piece structure to assist with a more manageable installation process. Made from hot dipped galvanised steel (100 and 114 O/D). The two-way Top Cap has been designed for over the row cabling and can be utilised across and down rows. A feature of the Top Cap is that it enables the cable or wire to be tied off directly to the anchor.
The Corner Strainer Assembly consists of a two-piece structure to assist with a more manageable installation process. It is made from hot dipped galvanised steel (114 and 140 O/D). The four way Top Cap is designed for over the row cabling enabling the cable to be tied off directly to the anchors.
The Middle Row Assembly has the same configuration setup to the Row End Assembly. The only difference is that the post is erected vertically (at 90 degrees). The ECO WIRE Clamp is sleeved into the top part of the post to support the over row cable across and down each row.
The Plate Flange is designed and used to strengthen the structural integrity of the netting structures. Precision robotic welding is used so that there is no compromise and consistency is achieved. Made from 5 and 6mm grade 300 steel it is then Hot Dipped Galvanised to prevent corrosion.